Case Study – Serial Assembly Line​

Challenge​

  • Hard to Evaluate total throughput, total rework and TAKT time​

Result​

  • Able to try multiple Iterations easily​

  • improve the digital twin, to achieve TAKT time.​

  • achieve TAKT time of 20 sec per throughput​

  • Output result such as resource statistics is obtained for each station in serial.​

  • The bottleneck is detected with a colour combination of yellow-grey (as marked in ppt)

  • Output 2: checking customer objective, TAKT time​

  • Time to reach a saturation production rate​

  • Output 2: checking customer objective, TAKT time​

  • Time to reach a saturation production rate

Found above case study similar to your challenges?

We at DTS can help! Speak to our Representative.

With more than 15 years of experience in PLM solution, our consultants and engineers are equipped with great skills and knowledge and ready to help.

Contact DTS